Filtered by vendor Oracle Subscriptions
Filtered by product Primavera P6 Enterprise Project Portfolio Management Subscriptions
Total 63 CVE
CVE Vendors Products Updated CVSS v3.1
CVE-2018-14718 5 Debian, Fasterxml, Netapp and 2 more 36 Debian Linux, Jackson-databind, Oncommand Workflow Automation and 33 more 2024-11-21 9.8 Critical
FasterXML jackson-databind 2.x before 2.9.7 might allow remote attackers to execute arbitrary code by leveraging failure to block the slf4j-ext class from polymorphic deserialization.
CVE-2018-1000632 5 Debian, Dom4j Project, Netapp and 2 more 17 Debian Linux, Dom4j, Oncommand Workflow Automation and 14 more 2024-11-21 7.5 High
dom4j version prior to version 2.1.1 contains a CWE-91: XML Injection vulnerability in Class: Element. Methods: addElement, addAttribute that can result in an attacker tampering with XML documents through XML injection. This attack appear to be exploitable via an attacker specifying attributes or elements in the XML document. This vulnerability appears to have been fixed in 2.1.1 or later.
CVE-2018-0735 7 Canonical, Debian, Netapp and 4 more 24 Ubuntu Linux, Debian Linux, Cloud Backup and 21 more 2024-11-21 5.9 Medium
The OpenSSL ECDSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.1.1a (Affected 1.1.1).